
Cabinet Installation
Our own crews install everything we sell. Nothing is handed to a subcontractor we have never met, and nobody is finished until you have walked the punch list with us.
Request a DesignOverview
The install is where a cabinetry job is won or lost
Good cabinetry badly installed is a bad kitchen. Scribing to out-of-square walls, setting a level run across an uneven floor, and getting the reveals consistent across a long elevation is skilled work, and it is the last thing anyone sees.
So we do not subcontract it. Our crews install what we design and sell, which also means there is nobody to point at when something needs putting right.

What we build
Three parts of a clean installation
Scheduling
Cabinetry sits at a specific point in the sequence — after the floor is in and before the countertop is templated. We schedule around your other trades and tell you early if a date is going to move.
The punch list
We walk the finished job with you and write down everything that needs attention, however small. Then we come back and clear it. The job is finished when you say it is.

How installation runs
We confirm the site is ready
Floors down, walls closed, and the room clear before the delivery date is set.
Our crew sets the cabinetry
Scribed, levelled, and shimmed to the room, with reveals checked across the run.
We walk the punch list
You list anything that needs attention and we come back and clear it.
Recent work
Installations we have finished




Questions
What people ask before they start
Yes. Our own crews install everything we sell, which is the main reason we can stand behind how the job ends up rather than only how it was specified.
Related services
Kitchen Cabinets
Islands, pantry walls, and full-height storage built to your dimensions. Framed, frameless, or inset.
View serviceDesign Services
A personalized design and a 3D rendering for every project, so the room is settled before anything is built.
View serviceCustom Cabinet Building
Custom and semi-custom lines under one roof, so the design leads and the budget decides which line builds it.
View serviceRequest a design
Talk to us about scheduling
Send a few details about the project and where it is in the build. Installation is already checked for you.
